F18.2
Description
Medium wastewater treatment plants | Capacity 189-757 million L/d. Cleanup, repair of small motors, buried conduits, and transformers required when flood level exceeds ground level. Clean and repair of major electrical equipment initiated when flood level exceeds 91.4 cm. | Derivation method: H (A+E+O)(A: analytical; E: empirical; O: expert opinion; H: hybrid)
Reference
Nirandjan, S., Koks, E. E., Ye, M., Pant, R., Van Ginkel, K. C. H., Aerts, J. C. J. H., and Ward, P. J.: Review article: Physical vulnerability database for critical infrastructure hazard risk assessments – a systematic review and data collection, Nat. Hazards Earth Syst. Sci., 24, 4341–4368, https://doi.org/10.5194/nhess-24-4341-2024, 2024.
License
Creative Commons Attribution 4.0 International - https://creativecommons.org/licenses/by/4.0/legalcode. See also https://zenodo.org/records/10203846
Exposure attributes
Primary hazard: |
Earthquake |
Secondary hazard: |
-- |
Continent: |
Africa |
Country: |
Malawi |
Region/City: |
-- |
waste water:Component: |
WWM |
waste water:Anchorage: |
-- |
waste water:Code provisions: |
-- |